The new railings on the “Goce Delcev” bridge that have transformed the appearance of this once modern architectural marvel in the Baroque “Skopje 2014” style were launched in 2011.

The railings violated the concept of the bridge’s clean, minimalist lines, replacing them with ornamental golden hollow pipes connected with small columns decoratively encased in aluminium.

Available data for the building

Ammount in euros:
557.967 €
Ammount in denars:
34.314.999 den.
Structure type:
Fence / Railing
Status:
Completed
Documentation
Download documents

Structure location