The marble abstract sculpture “Energy Transfer”, measuring 180 х 80 х 80 centimetres, was placed in front of the building of Macedonian Opera and Ballet in April 2009 as an integral element of the first wave of the “Skopje 2014” project.

Two other marble sculptures by the same author, “Endless Integral” and “Energy Transfer”, positioned in 2009, were made in the same quarry Bela Pola in Nebregovo.

Available data for the building

Ammount in euros:
11.136 €
Ammount in denars:
684.840 den.
Structure type:
Sculpture
Status:
Completed
Documentation
Download documents

Investors and contractors

Structure location